Solid Waste management

Construction of Alexandroupoli Landfill site – Budget of 6.200.000 €

Hydromanagement Ltd performed a design project for the construction of a Residue Sanitary Landfill in Alexandroupoli. The landfill site is part of a modern Integrated Waste Treatment Facilitiy in the eastern sector of Eastern Macedonia and Thrace region.
Solid Waste management, Wastewater Management

Leachate treatment plant at Tagarades landfill site

Hydromanagement Ltd conducted the design project for the Leachate Treatment Plant of Tagarades Landfill site in the region of Thessaloniki.
Solid Waste management

Solid Waste Transfer stations Construction and Operation, Xilofago and Skarino, Cyprus

Hydromanagement Ltd implemented the final design study for BILFINGER BERGER UMWELT HELLAS concerning the construction and operation of two Solid Waste Transfer Stations in Xilofago and Skarino (Cyprus).

Featured Projects

  • Bid study for the Expansion and Upgrade of the Existing Drainage Management Projects of the X.Y.T.A. of the Prefecture of Thessaloniki (Mavrorachis Wastewater Treatment Plant) – capacity 400 m3/d.
  • Construction of a sanitary waste landfill (X.Y.T.Y) of the Eastern Sector of the Region of Eastern Macedonia – Thrace – 260,000 IK – budget 6,200,000 €
  • Leachate treatment unit at X.Y.T.A. Tagarades – capacity: 150 m3/d.
  • Rehabilitation of the waste disposal area of Arta – Deposits of 230,000 m3
  • X.Y.T.A. Administrative Unit of Syros – Restoration of existing X.A.D.A. and design of X.Y.T.A. capacity 540,000 m3 – 45,5000 I.K.
  • Bid study for the establishment of a waste transshipment station (S.M.A.) for Athens and neighboring municipalities in Eleonas (Attica) – Capacity: 145,000 tn/yr – budget €13,850,000
  • Extension of X.Y.T.A. Municipality of Katerini – Construction of Phase B – 113,000 IK – 335,000 m3 of waste.
  • Bid study for the construction and operation of transit stations in the provinces of Larnaca – Famagusta at the locations of “Xylofagos” & “Skarinos” – 90,000tn/yr & 11,000tn/yr
  • Bid study for a Waste Transfer Station in the area of Mytilini, Lesvos Island – 54,000 IK, 21,400 tn/yr
  • Restoration study of the uncontrolled solid waste disposal site of Kalochori – Natura area 160,000 m2
  • Consultant Services for the contractor of the project: “Rehabilitation of Uncontrolled Waste Disposal Area of Niselio, Municipality of Katerini”
  • Consultant Services for the contractor of the project: “Rehabilitation of inactive H.A.D.A. Prefecture of Imathia”
  • Consultant Services for the contractor of the project: “Establishment of X.Y.T.A. Kozani – Ptolemaida axis”