Solid Waste Transfer stations Construction and Operation, Xilofago and Skarino, Cyprus

Hydromanagement Ltd implemented the final design study for BILFINGER BERGER UMWELT HELLAS concerning the construction and operation of two Solid Waste Transfer Stations in Xilofago and Skarino (Cyprus). The units have an annual capacity of 90.000 and 11.000tn/y and serve 63.500 και 16.000 inhabitants, accordingly.

The following studies were performed:

  • Structural calculations
  • Electromechanical calculations
  • Ιnfrastructure study
  • Roadworks
  • Rainwater management
  • Waste transshipment equipment