Energy analysis and optimization of the operation of wastewater treatment facilities in order to reduce the energy footprint and greenhouse gas emissions

The proposal concerns the production of an integrated “tool” for the functional-energy evaluation and the optimization of the operation of the Wastewater Treatment Facilities (WWTP) of Greece with the possibility of application in other developing countries. The purpose of this tool is to help WWTP management and operation agencies to establish the necessary systems and […]

Provision of control services and detection of invisible leaks in the water supply network of D.E.Y.A.F. in the city of Florina

Specifically, the service includes: Συγκεκριμένα η υπηρεσία περιλαμβάνει: Conductor control with digital noise correlation (Correlators) Duct control with digital noise loggers (NoiseLoggers) Control of pipelines using groundphones (Groundphones) Evaluation of audio findings and digital recordings Indication of the point to be excavated, if there are finds and records Compilation of technical report of works

Preparation of Definitive Studies of Flood Protection Projects and Rainfall Networks, Water Supply, Sewerage, Irrigation and Fire Extinguishing of Common Areas.

The scope of the Final Flood Protection Studies and the construction of the Rainfall, Water Supply, Sewerage, Irrigation and Firefighting Networks of the Common Areas of the property, where the Thess INTEC Business Park is to be developed, includes the study of all required works for the implementation: The Anti-Flood Protection Works of the property, […]

Preliminary study of the sewage network and waste water treatment plant of Ithaka

The project consists of: The internal sewage network of the city of Vathi. The study proposes the implementation of a new sewage network which consists partially of a gravity network section and a vacuum section (independent networks). The sewer transportation network towards the Waste Water Treatment Plant Finding alternative locations for the construction of the […]

ENVIRONMENTAL IMPACT STUDY OF B.A.A. PROJECTS

The scope of the contract included the preparation of the environmental studies of the projects: Construction of Thermopylae and Vasiliki Roundabout Roundabout at the junction of Papapostolou and Arkadiou streets in order to carry out the required environmental licensing of the projects. The purpose of the projects was the improvement and upgrading of the prevailing […]

Study of Deodorization projects of the Central Sewer Pipe of Thessaloniki

The project is part of the Agreement Framework for the provision of Technical Consultant support services for studies & projects of the Strategic & Operational Plan of EYATH SA Start Date: 16/09/2019. End date 16/09/2025 The subject of the contract is the provision of technical services with a framework agreement specific to projects and studies […]