Waste Water Treatment Plants

  • Definitive study of sewage transport pipelines and preliminary study of the sewage treatment plant of the Patitiri – Votsi settlement of the Municipality of Alonissos
  • Maturation of the waste water management project D.K. Zagora, Municipality of Zagora Mouresi
  • Study of renewal of E/M equipment of Mytilene Wastewater Treatment Plant
  • E/M equipment renewal study of the city of Giannitsa, D. Pellas
  • Renewal and energy upgrade study of WWTP’s E/M equipment. and of the drainage pumping stations of Krya Vrysi, DE Kryas Vrysis, Municipality of Pella
  • Design of construction of the WWTP in Argos Orestiko
  • Definitive study of the Sewage Treatment Plant of the city of Orphanio, Municipality of Pangaio
  • Modernization of Βiological purification units of Kozani Waste Water Treatment Plant
  • Maturation of the waste water management project D.K. Zagora, Municipality of Zagora Mouresi
  • Definitive study of sewage transport pipelines and preliminary study of the sewage treatment plant of the Patitiri – Votsi settlement of the Municipality of Alonissos
  • Definitive Study of renewal and improvement of the Wastewater Treatment Plant of the city of Corfu
  • Definitive Study for the renewal and improvement of the Trikala Waste Water Treatment Plant
  • Study of emergency interventions in the sewage system of Kynopiastes area, Corfu
  • Study of renewal of pumping stations of the city of Corfu
  • Study of renewal of E/M equipment of Mytilene Wastewater Treatment Plant
  • Update of Mytilene Wastewater Treatment Plant Study (Phase II Projects)
  • Study of the sewage network and Wastewater Treatment Plant of Aristi, Municipality of Zagori
  • Definitive study of the sewage network and preliminary study of the sewage treatment plant of Chora Folegandros
  • Preliminary study of the internal sewage network and Preliminary study of sewage treatment plant projects of the Zagora settlement of the Municipality of Zagora – Mouresi
  • Water Supply Network, Sewerage Network and Biological Treatment Plant in Nsork Settlement, Equatorial Guinea, Africa
  • Stara Zagora Wastewater Treatment Plant Bulgaria – 255,000 IK – activated sludge method.
  • Study of implementation of sewerage network and sewage treatment plant of the city of Constanta North in Romania.
  • Bioremediation study Eforie Romania – 120,000 IK – activated sludge method.
  • Feasibility study of connection of the industrial zone BI.PE.TH. with the central wastewater treatment plant of the city of Thessaloniki.
  • Design of a Wastewater Treatment Plant Ag. Pelagia Municipality of Malevizio (Crete) – tertiary treatment, MBR, 14,000 IP phase A and 24,000 IP phase B, budget €4,300,000
  • Upgrade – Expansion of the sewage treatment plant Ag. Nikolaou (Crete) – tertiary treatment, MBR, 14,000 IK in summer and 8,000 IK in winter, budget 5,000,000 €
  • Definitive study waste water treatment plant & study update: “Rain and sewage drainage networks and waste water treatment plant of Filiates city and drafting of Tender Documents.
  • Application study for the construction of wastewater treatment plants of the Municipality of Evergetoulas in Lesbos – Three Wastewater Treatment Facilities 000 IK, 550 IK and300 IK – budget €5,000,000
  • Bid study for the drainage and installation of wastewater treatment and disposal in the settlements of D.E. Kouloukona and Zonianon of the Municipality of Mylopotamos
  • Study of internal sewage network and study of installation of sewage treatment of Paramythia and Karyotiou of Paramythia Municipality
  • Pilot program for the project contractor: “Demonstration unit for biological sludge management by WWTP Thessaloniki and the production of suitable soils by the soiling method”

Sewerage and Storm Water Networks

  • Preliminary Study of Hydraulic Flood Protection of the Thess INTEC Business Park
  • Rainfall study of the Steni Vala settlement of the Municipality of Alonissos
  • Renewal of Corfu City Sewage Pumping Stations
  • Study of emergency interventions in the drainage system of Kynopiastes, Corfu
  • Study of anti-flood projects in the Kochela area of Corfu
  • Assessment study of the rain runoff conditions at the Agios Markos Lake site, Corfu
  • Definitive study of the sewerage network of Olympiada, Municipality of Aristotelis – Vacuum method, 30 km of pipelines 550 collection wells – vacuum valves and two vacuum pumping stations – Served population 6,500 households
  • Vacuum network of Galatades and Karyotissa settlements, Municipality of Pella – 16.7 km pipeline network, 328 collection wells, vacuum valves and two vacuum pumping stations – 4,500 IK
  • Implementation study of sewage collection and transport projects T.K. Prefecture of Plagion – Vacuum network – Vacuum drainage system, consisting of 4.6 km of piping network, 402 collection wells – valves and vacuum pumping stations – 8,300 IK
  • Vacuum Sewer Network and Wastewater Treatment Plant in Stratoni city, Municipality of Aristotelis in Halkidiki – Suction Sewer System – 2.4 km pipeline network, 41 wells – suction valves and vacuum pump station – 350 EP
  • Jeddah 3: Industrial City – Redesign of Infrastructure Networks – Optimizing the design of the rainwater network of the industrial area 3
  • Elaboration of a Guide for the integrated management of rainwater in the context of the INTEGRATED GREEN CITIES project (Municipality of Thessaloniki, Directorate of Greenery, Department of Trees, Trees and Plants, 2013)
  • Rainwater drainage – field drainage study of the “KAUTANZOGLIO STADIUM OF THESSALONIKI”
  • Project Design of internal drainage networks of Methoni, Makrygialos, Prefecture of Agathoupoli, Municipality of Paleochori – 1.000 IK, gravity networks 57,000 m – 11 pumping stations
  • Definitive sewage and rainwater drainage study of the settlements of N. Chili and Maistro of the Municipality of Alexandroupolis7000 capita equivalent, two sewage pumping stations
  • Definitive Study of stormwater drainage networks – sewage & Preliminary Study of Biological Treatment of the Municipality of Alonissos – 3 km external, 18 km internal sewage network, pumping stations – internal stormwater network – Prolonged aeration activated sludge method – 12,000 capita equivalent with large seasonal variation
  • Study of emergency anti-flooding works of Krausidona stream – study of stream arrangement, hydraulic study and control of hydraulic adequacy of the cross sections of the stream for uniform and non-uniform flow solutions proposals
  • Protection & development research of the old city of RethymnoDefinitive study of the city of Rethymno’s dirty and stormy network
  • In addition, HYDROMANAGEMENT Ltd. has carried out a significant number of specialized projects in the field of street drainage. Specifically during the construction of Egnatia Road, it undertook the drainage for different junctions, tunnels and sections of the road with a total length of 50,000 m of pipelines for approximately 70,000 m of road