Construction of Alexandroupoli Landfill site – Budget of 6.200.000 €

Hydromanagement Ltd performed a design project for the construction of a Residue Sanitary Landfill in Alexandroupoli. The landfill site is part of a modern Integrated Waste Treatment Facilitiy in the eastern sector of Eastern Macedonia and Thrace region. The capacity of the landfill is 669.300 m3 and its operation serves a population of 260.000 inhabitants. Budget of 6.200.000 €

The following studies were performed:

  • Landfill basin configuration
  • Bottom, slope and top sealing
  • Leachate collection and treatment
  • Landfill gas management
  • Rainwater management
  • Landfill gas management
  • Rainwater management
  • Roadworks
  • Structural calculations
  • Structural calculations
  • Ιnfrastructure study
  • Environmental monitoring and control
  • Landfill operational plan
Πελάτης
Κ/Ξ Μ.Τ Α.Τ.Ε. – ΑΣΦΑΛΤΙΚΑ ΕΒΡΟΥ Α.Τ.Ε.
Ημ/νία Υλοποίησης
2014
Είδος έργου
Αρχεία
    Φωτογραφίες