Study of the renewal of the electromechanical equipment of Mytilene sewage treatment facilities & Update of the study of Mytilene sewage treatment facilities (Phase 2 Projects).

A. E/M equipment renewal study of Mytilini Wastewater Treatment Facilities – Mechanical, Electrical, Electronic studies The object of the contract is the final study of the renewal of the electromechanical equipment of the sewage treatment plant of Mytilene, which has been designed for 40,000 i.c. Compilation of tender documents. Project budget €3,895,350.00. Entry units. Replacement […]

ENVIRONMENTAL STUDY OF SEWAGE AND WASTEWATER TREATMENT PROJECTS OF FOLEGANDRO ISLAND

The scope of the contract included the preparation of the Environmental Impact Study of the sewage and wastewater treatment projects of the island of Folegandros. The project turned out to be an infrastructure, drainage and wastewater treatment project and concerns the management of the municipal wastewater of the Chora settlement of Folegandros. Folegandros is an […]

ENVIRONMENTAL IMPACT STUDY of the project “Sewage networks and preliminary study of sewage treatment facilities of the settlements of Agia Paraskevi Tsagarada, Agia Marina Kissos and the settlements of the Coastal Front (Ag. Ioannis, Papa Nero, Damouhari), of the Municipality of Zagora – Mouresi”

The project is an infrastructure, drainage and wastewater treatment project and concerns the management of the urban wastewater of the settlements of Agia Paraskevi Tsagarada, Agia Marina Kissos and the settlements of the Coastal Front (Ag. Ioannis, Papa Nero, Damouhari), of the Municipality of Zagora – Mouresi. Specifically it included: The construction of sewage networks […]

Telemetry system – GIS – Hydraulic simulation of Grevena water supply network

In the framework of the project “Replacement of water supply network and new water tanks in the City of Grevena”, spatial mapping of the Grevena water supply network and creation of thematic maps were conducted using the Geographic Information System (GIS) Software “ArcGIS”. Moreover, a hydraulic model was constructed using “InfoWater”, which is a fully […]

Έργα αναβάθμισης Η/Μ εξοπλισμού Ε.Ε.Λ. Τρικάλων

The study included: Electrical engineering study of renewal, improvement of the WWTP equipment in Trikala E/M study of tertiary processing WWTP Trikala Estimating and budgeting of project Tender issues for the study of renewal, improvement of WWTP’s E/M equipment. Moreover Hydraulic study for improvements on the WWTP’s design. Trikala Hydraulic study of the WWTP’s tertiary […]

Study of renewal and improvement of the the WWTP of the city of Corfu

The project consists of: Hydraulic expansion study of the WWTP Corfu, B phase E/M study of renewal, improvement of equipment and expansion of phase B of the WWTP Corfu Automation study WWTP Corfu Hydraulic study for the replacement of an underwater sewage disposal pipeline of the WWTP Tender issues for the renewal, improvement and expansion […]

Management of water resources at the watershed level under conditions of climate change

Hydromanagement Ltd implemented the research program entitled: “Management of water resources at the watershed level under conditions of climate change” financed by the General Secretariat of Research and Technology. The aim of the project was to integrate climate change impact assessments into catchment area management plans. In collaboration with the Hydraulics and Technical Environment Department […]

Vacuum sewage network of Nea Plagia , Chalkidiki region

Hydromanagement Ltd completed the design project for wastewater collection and transportation in Nea Plagia, Chalkidiki. The project serves a population equivalent of 8.300. The study includes the following construction phases: 402 collection chambers – suction valves 3”. Vacuum sewer system consisting of 5.8 km of HDPE SDR11 piping network with monitoring system Vacuum pumping station: […]