Μελέτη – Κατασκευή ΕΕΛ Θέρμης

10/05/2022

Hydromanagement Ltd. as Consultant-Study of the project in the tender phase with the Study-Construction system, undertakes the obligation to prepare on behalf of the Contractor of the project the final Study and the Technical Application Study.

The WWTP will serve 30,000 residents in phase A and 60,000 residents in phase B. The effluent quality is that of secondary treatment, while the prolonged aeration method with MBR is applied.

The project budget amounts to €7.317.073 plus VAT